Install new 2000 Amp 480 volt main electrical service, office build out and gluing department machine power.
New 4,000 amp 480 volt main electrical service
Design, Build and Install. Convert SLC500 PLC program to new CompactLogix PLC program. Replace and Upgrade (2) burner management panels. Replace existing Siemens PLC and convert them to Allen Bradley ControlLogix PLC.
LED High Bay Lighting Retrofit
Rosecrans Hall, Leavey 4 Hall, McCarthy Hall and Hannon Apartments Lighting Retrofit
Cathedral High School “The arts Complex.” Ground up 14,000 square foot theater with 350 seats including all power, lighting, fire alarm and raceway for data and audio visual contractors. Complete build out of a 28,000 square foot 2 story classroom building with parking structure
Relocate existing facility and newly acquired companies into one central facility. This included (200) new warehouse lights and over (20) label machines and pieces of equipment.
275,000 SF Warehouse and Office T.I. Installing new warehouse lighting system, replace all office lights and all exterior lights
Relocate existing facility to new building. Install new distribution electrical system to accommodate (19) Digital Presses, (5) Flex-O Presses with the chiller, UV systems and compressors. Office T.I., Data to equipment and Security/ access control conduit and wiring.
Warehouse Lighting Replacement in approximately 350,000 SF
Install new 400 amp service, (9) Utility poles for new overhead distribution, (6) distribution panels and transformer’s with conduit and wring for (30) tiny homes to house the homeless.